One application that carries the whole project: model, quantities, budget, schedule and site — connected, and every number traceable back to what it was measured from.
Daily reports, photos, takeoff, weekly scheduling, RFIs, punch lists, safety items, NCRs, specifications, submittals, change orders and markups live in different places — which makes it hard to see the whole picture.
Twelve sources, and not one of them knows about the others — so the right number is whichever screen you happened to open.
The same twelve, on one chain: every quantity, every cost and every photo tracing back to the same model, the same floor and the same zone.
Every other stack asks you to export from one program and import into the next, and to trust that nothing changed on the way. Here the quantity you measured on the model is the same one the budget prices, the schedule sequences and the site reports against.
One measurement, five readings. Nobody re-typed it, nobody re-measured it — and eighteen months later the screenshot of where it came from is still attached to it.
Every quantity carries the screenshot of where it was measured, the level and zone it belongs to, and who measured it. Not in a separate document — attached to the number itself.
So when the budget prices it, the schedule sequences it and the site reports against it, they are all talking about the same thing. Nobody measures it twice. Nobody reconciles two spreadsheets that should have matched.
That is what the chain is for. Not to save clicks — to produce a number you can defend eighteen months later. A quantity that cannot be traced is a quantity nobody will sign.
Six pillars that cover the project from the first feasibility study to closeout — and the reason to have them together is that a change in one is already a change in the others.
The point is not that there are six. It is that a project moves from Studio to Connect without losing context on the way — which is why a change in one is already a change the others understand.
Two IFC models — architecture and structure — loaded in a browser tab. The levels come out of the model, the issues are pins on it, and the RFI carries its thread, its photo and its answer.
The schedule is not a separate file. It is the same measured quantities, the same crews and the same costs — seen along the calendar. Move one activity and everything that depends on it moves with it.
Live interface, not a screenshot — pick another activity.
A pending item that nobody answers is not a communication problem. It is a wall that gets built wrong, and it costs what it costs to take it down again.
The third step is the one that decides the other three. The person who answers never creates an account — they get a link, not an invitation. Every field we would ask them for is an answer we would not get, and an answer that never arrives is a pending item that stays open.
Annual is ten months: pay 10, use 12. Cancel anytime.
A buyer wants 802 and 803 as one apartment. That single request goes through the shear wall, the stair, the budget, the schedule and the sales table — and the seven read it from the same record, without anyone typing it again.
Your buyer wants 802 and 803 as one apartment. You raise it once, with both units attached, and it stops being an email thread nobody can find.
Decide with the numbers in front of you: one unit less to sell, a change order with a price on it, and what it does to what is already sold and reserved.
Redraw the two as one with the stair where it fits, and check the code still holds — egress, occupancy and the unit count the permit was issued on.
The opening in the shear wall and the slab cut for the stair. Measure the impact on the model and say what it takes to compensate it — before anyone demolishes anything.
Two kitchens, two panels and two meters become one — and something crosses the wall that is about to be opened. See it in the viewer before the opening is drawn.
Price the change order down to the resource: demolition, the reinforcement the structure asks for, the stair, and the finishes that stop being two apartments.
Level 8 is already poured. Know what this moves in the schedule and what has to be undone, on the same board where the RFI and the punch already live.
Cancel anytime. If you cancel, your founding price will no longer be available.
We are opening accounts in September, a few at a time so we can set each one up properly. Leave your email and you go in the first round.
We are opening accounts in September, a few at a time so we can set each one up properly. Leave your email and you go in the first round.